These preformed polystyrene sections are designed to create a void around steel underpinning jacks. This is achieved by placing two halves together around the scaffold tube. Once concrete has been poured to the foundations, the polystyrene can be disposed of to allow the removal of the jacks for re use.
Material | Polystyrene |
---|---|
Manufacturer | No |