The Tie Bar is inserted through the Tie Bar Sleeving and Tie Bar Cone. The Waler Plates are secured to the outside of the formwork using the Wing Nut. The Tie Bolt Cones can be removed once striking of the formwork has taken place and the hole filled with the Formplug to produce a watertight repair to the surface of the finished concrete.
Material | No |
---|---|
Manufacturer | No |